Friday 5/13/2022 06:00AM we will be performing emergency maintenance on our Faxback Server. This maintenance will only affect Enterprise Faxback services. The expected downtime is 15 minutes, and the maintenance window is 2 hours.
Phone Switch Maintenance
Update: 12:10 AM Maintenance is complete.
May 12th, 2022, at 11:59 PM we will be performing maintenance on our phone switch. No service interruptions are expected as a result of this maintenance. The window for this maintenance is 4 hours.
~Network Engineering
Legacy DSL Outage
Update: All customer connectivity was restored around 10:15PM this evening. Additional work to restore power redundancy continued and has since successfully completed.
We are currently investigating an event in one of our data centers that appears to have caused an outage to all legacy DSL services. Approximate outage beginning was 7:06p. Work is ongoing to rapidly identify and resolve the event causing this issue.
-Network Engineering
Benecia, Buena Park, Brea, Corona Del Mar, Costa Mesa, Fullerton – Intrusive Maintenance for Fusion and FlexLink Copper Services
Update 5/13/2022 2:03AM: This maintenance is now complete.
Thursday, 5/12/2022, starting at 11:59 PM, we will be performing intrusive maintenance affecting Fusion and FlexLink copper customers in Benecia, Buena Park, Brea, Corona Del Mar, Costa Mesa, Fullerton. Expected down time within the maintenance window is approximately 30 min. The maintenance window is 4 hours.
-Network Engineering
Burlingame – Fusion Fiber Intrusive Maintenance
Update 4:20AM: This maintenance is now complete.
Tomorrow (5/6/22), starting at 2:00 AM, Fusion Fiber customers in the Burlingame area will experience a service interruption while we perform maintenance. The expected down time is about 30 minutes while the equipment upgrades. The maintenance window will be 4 hours.
– Network Engineering
San Bruno – Intrusive Maintenance for Fusion DSL and FlexLink Copper Services
Update 3:43AM: This work is now complete.
Wednesday morning, 5/4/22, starting at 2:00 AM, we will be performing emergency intrusive maintenance affecting Fusion DSL and FlexLink copper customers in San Bruno. Expected downtime within the maintenance window is approximately 30 min. The maintenance window is 4 hours.
-Network Engineering
Irvine, Buena Park – Intrusive Maintenance for Fusion and FlexLink Copper Services
Update 5/06/22 12:56A: This maintenance is now complete.
Thursday, 5/05/2022, starting at 11:59 PM, we will be performing intrusive maintenance affecting Fusion and FlexLink copper customers in Irvine and Buena Park. Expected down time within the maintenance window is approximately 30 min. The maintenance window is 4 hours.
-Network Engineering
Santa Ana – Intrusive Maintenance for Fusion and FlexLink Copper Services
Update 5/04/22 12:56A: This maintenance is now complete.
Tuesday, 5/03/2022, starting at 11:59 PM, we will be performing intrusive maintenance affecting Fusion and FlexLink copper customers in Santa Ana. Expected down time within the maintenance window is approximately 30 min. The maintenance window is 4 hours.
-Network Engineering
San Bruno – Intrusive Maintenance for Fusion DSL and FlexLink Copper Services
Update 3:26AM: This work is now complete.
Tomorrow morning, 4/28/2022, starting at 2:00 AM, we will be performing emergency intrusive maintenance affecting Fusion DSL and FlexLink copper customers in San Bruno. Expected downtime within the maintenance window is approximately 5 min. The maintenance window is 4 hours.
-Network Engineering
Phone Switch Maintenance
Update: 1:04 AM Maintenance is completed.
April 26th 2022 at 11:59 PM we will be performing maintenance on our phone switch. No service interruptions are expected as a result of this maintenance. The window for this maintenance is 5 hours.
~Network Engineering