San Jose Emergency Fiber Intrusive Maintenance

Update 1:42AM: This maintenance is now complete.

Tonight, starting at 11:59 PM, we will be performing intrusive maintenance affecting a subset of fiber customers in the San Jose. The expected down time is approximately 10 minutes. The maintenance window is 2 hours.

– Network Engineering

Phone Switch Maintenance

Update (1:30am) Maintenance is complete

Jan 12th, 2023, at 11:59 PM we will be performing maintenance on our phone switch. No service interruptions are expected as a result of this maintenance. The window for this maintenance is 4 hours.

~Network Engineering

Phone Switch Maintenance

Update (12:42am) Maintenance is complete

Jan 10th, 2023, at 11:59 PM we will be performing maintenance on our phone switch. No service interruptions are expected as a result of this maintenance. The window for this maintenance is 4 hours.

~Network Engineering

Phone Switch Maintenance

Update (1:32am) Maintenance is complete

Jan 5th, 2023, at 11:59 PM we will be performing maintenance on our phone switch. No service interruptions are expected as a result of this maintenance. The window for this maintenance is 4 hours.

~Network Engineering

Sonic Routing Instability

This morning Sonic noticed routing instability within our network and began emergency maintenance on the affected equipment to bring back normal network operations. This instability affected many of our enterprise circuits. We are currently in the process of restoring normal IPv4 and IPv6 routing for these circuits and believe the issue is resolved. If you are still having issues with your enterprise circuit you can reach out to our Network Operations Center.

Oakland Residential Fiber Intrusive Maintenance

Update(12:30) Maintenance is complete

Tuesday (12/27/22), starting at 11:59 PM, a subset of residential customers in the Oakland area will experience a brief service interruption while we perform some maintenance. The expected downtime is about 15 minutes while the equipment upgrades. The maintenance window will be 4 hours.

– Network Engineering

San Leandro Copper Emergency Maintenance

Update (8:32AM) We ran into a few issues that caused this work to take longer than expected.  Maintenance is now complete and connectivity should be restored for all impacted customers.

A piece of hardware serving all copper Fusion/Flexlink customers in San Leandro is critically failing and has necessitated emergency replacement.  A technician has been dispatched to it’s location and we hope to perform the work in the next hour (7-8AM).  Steps are being taken to minimize customer downtime but we expect a few minutes of impact for everyone served off this device. An update will be provided when work has been completed.

– Network Engineering

Oakland Fiber Intrusive Maintenance

Update(1:13) This maintenance is now complete.  If you are experiencing any issues please reach out to Support.

Wednesday (12/14/22), starting at 11:59 PM, a subset of residential and business customers in the Oakland area will experience a brief service interruption while we perform some maintenance. The expected downtime is about 30 minutes while the equipment upgrades. The maintenance window will be 4 hours.

– Network Engineering