Santa Rosa colocation stays up.

Mon Mar 19 12:44:54 PDT 2007 — Santa Rosa colocation stays up. Early Friday morning we experienced an outage on one of the two AT&T-provided Gigabit links leaving our Santa Rosa datacenter. Our Network Operations Center worked to isolate the trouble, which turned out to be a failed regenerator card in a Fremont central office. The card was replaced around 4:00pm, bringing the link back into service. The end result was a total of 2 seconds of packet loss for colocated customers, plus a very happy NOC staff. It’s always fun to see our carefully planned redundancy work in the real world! -Nathan and the NOC (Jared, Zeke, and Matt)