The UPSes for our Santa Rosa Datacenter are scheduled for their regular maintenance on Tuesday, Feb. 14th starting at 10:00AM. Maintenance is fully scripted with our vendor and should not impact any services. However, the maintenance does involve bypassing the UPS and running loads directly on utility power. The backup generator will be kept running for the duration of the maintenance to protect against utility power failure.
– Sonic Facilities and System Operations